2007

Perth Road 163 Resurfacing

Location:
Commencing at Rannoch and extending north for 7.9 kilometres.

Description:
Cold in Place recycled and overlaid with hotmix that includes RAP which will reduce the identified capital needs of the County and improve the quality of the road leading to improved safety and reduction of green house gases.  The asset lifespan of this road section will be extended to 15-20 years.
 
Total Job Cost: $992,000.00
 
Gas Tax Funding: $593,493.67

2006

Perth Road 135 Resurfacing

Location:
Commencing at the north limit of Rostock, north to Perth Line 55. Distance of 6.1 kilometres.

Description:
Cold in Place recycled and overlaid with hotmix that includes RAP which will reduce the identified capital needs of the County and improve the quality of road leading to improved safety and reduction of green house gases. The asset lifespan of this road section will be extended to 15-20 years.
 
Total Job Cost: $615,141.38
 
Gas Tax Funding: $579,790.70

Culvert Replacement 044-013

Location:
Concession 8, Lot 3 Township of Perth East, Ellice Ward 

Description:
The culvert at this location was replaced resulting in a reduction of the identified capital costs needs of the County, safety improvements and elimination of the need for load limit restrictions.
 
Total Job Cost: $214,301.01
 
Gas Tax Funding: $ 33,733.00

Culvert Replacement 086-103

Location:
Concession 1, Part Lot 1 Township of Perth East, Mornington

Description:
The culvert at this location was replaced resulting in a reduction of the identified capital costs needs of the County, safety improvements and elimination of the need for load limit restrictions. 
 
Total Job Cost: $129,429.99
 
Gas Tax Funding: $18,333.00