Location: Perth South – Perth Line 32 to Sebringville
Construction Details: Cold in-place road recycling and surface paving, line painting, sign replacements and granular shouldering.
Timing: June – August 2026
Impact: Rolling lane closures, Pilot Vehicle. The travelling public can expect lane reductions and delays during all construction phases. Short-duration closures.